Moth

Off-site Assembly

These are six identical curved wings constructed with 3/4” pipe.
Created attachment points so each wing could be positioned and installed on-site.

On-site Install

In Philadelphia, the space did not replicate the test installation executed in Columbus due to an interference with ductwork. With a shorter measurement than anticipated, I had to re adjust the placement of the wings to achieve a symmetrical position which involved welding inside of the finished piece.